Showing posts with label turntable. Show all posts
Showing posts with label turntable. Show all posts

Monday, 20 February 2012

Noughts and crosses

Isn't always the way? Yesterday I decided to post a layout that I normally wouldn't have shared, just to let everyone know we hadn't fallen off the edge of the world and then today I come home to a new layout!

Isaac is maintaining the simplicity theme. In fact today's track seems to be all about places where rolling stock and engines can be stored rather than any sort of journey they could make. The one circuit is completely inaccessible to any of the trains using the main track.

The forest on the plinth is back and there are three buildings as well. The combination of repair shed, tunnel and level crossing in close proximity is intriguing.

At the other end of the line is a rare example of the turntable being used to access sidings rather than a a replacement for the cross over. 

For such a small layout there was a lot of rolling stock, but only one engine. But whatever it's quirks it's nice to have Isaac building again.


Wednesday, 8 February 2012

The roundabout way from A to B


It's been a bit of a linear day for our sons. The first layout was built by Isaac's brother, I have no photo, but it was described to me by mum. It was a straight track with buffers either end, it had both the turntable and cross over in it, but the essential main line was the straight track. Isaac's brother then put the battery train it and ran it from one end and back again for quarter of an hour.

Later Isaac got to work on this layout. Although it looks quite complicated it is actually just a track between two points, the siding and the engine shed. It is also sprawls, which is why none of the photos quite get it all in. Despite it's simple form there are a couple of marvellous elements to it.

Starting at the engine shed you come to the loop after the bridges. Instead of taking a tight turn Isaac made a loop that had a single track in and out a set of Y points. The train is turned around and goes back down the way it came. It can either retrace the route back to the shed or continue down the line.

Continuing down the line brings it eventually to the siding, which is tucked down the side of the sofa. On the return leg the train can take a little diversion onto a small circuit. But once on there you have two choices:
1. Get very dizzy
2. Reverse off

I do like the mixture of simplicity and little twists in this track. It feels like you're taking a journey and yet not going too far.


Tuesday, 24 January 2012

Giving it all we've got (almost)


It's nice to be right once and a while. The New Heights track did remain up overnight and Isaac busied himself extending it in the morning.

He started by putting in the lifting bridge and this set the direction of the build. The suspension bridge was added to make it over the other side of the loop. To start the the new loop Isaac extended out the siding that had the repair shed on it. I was expecting that he'd aim to join the other side of the loop back on somewhere near the tunnel. making a layout of twin loops with a share track on one side.

But Isaac had other ideas and put the siding in on the loop that went under the new viaduct. At the same time he put the turntable back in and added a couple of sidings for rolling stock to be kept. This is one of those rare occasions where the turntable is used in more conventional way. The sidings and position of the new points led to a lack of straights to complete the layout. Rather than compromising the plan Isaac turned to me for help. I suggested using his hump back bridge and level crossing on one of the original loops to free up some of the straights.

Once all this had been done there were very few pieces left in the track boxes. I suppose with some more planning even they could have been integrated.

I have to say the layout is a really pleasing one if you're looking for a long journey on a train before getting back to where you started from. It is possible to do a route that involves a circuit of all three circuits before you get back to square one.

As an aside, Isaac and I worked out a solution to one of those problems that had been vexing him for a sometime. Namely the issue that the red suspension bridge did not have enough clearance for his Thomas trains. The solution was two piece of Lego under the towers raising it by just enough so Thomas could pass by smoothly.



Thursday, 19 January 2012

More motorway than railway

Isaac dumped the buildings for his latest layout and reinstated the bridges, which have been absent for the last few days. He also made full use of all the points at his disposal. This was one of those layouts that made me wish I was an inch high and could ride it because it looked like a lot of fun.

Isaac has been experimenting a couple of weeks back with a long viaduct. I don't seem to have any photos of it because it only lasted a couple of hours (if I find some I'll add it to this post). He discovered that three Duplo bricks piled up made a perfect hight pier to support the track sections. The problem is that the track moves on the Duplo because there is little friction holding it there. In this layout he returned to the idea, but only for one pier, allowing Isaac to form a fairly long bridge.

The most striking element of this layout is the cloverleaf design at the bottom of the ramp. It is highly fictional allowing trains to direct themselves onto the correct track element with ease and without having to reverse. The only odd element is the turntable, which Isaac still prefers over the cross piece despite its limitations.

Another element that reminded me more of a motorway than a railway was the track running parallel to the bridge. I don't think the photos really do it justice.

Passing loops, sidings and debates

Isaac started this layout off in a similar way to yesterday's 'elaborate' layout. He began with the repair shed and added the Y points. But on the second entrance he added a set of points and then made a passing loop form them. If you remember back to the 'It's a family affair' layout it was mum who came up with the idea, but Isaac never really took it up. Until now. Which just goes to show that a child might show no signs of taking ideas on board, but they're always listening and watching.


Isaac built on the idea of a running loop, that he used yesterday, and extended that out into quite a orderly, by his standards, rectangular loop. The addition of the engine shed on a short siding and the level crossing were the final touches Isaac added to the layout.


About half an hour later Isaac had gone off somewhere and his brother came and added in the turntable and two sidings. Isaac's return prompted a "loud and lively discussion" on the merits and desirability of this addition to the layout. Eventually after being offered an option to go away and calm down Isaac accepted the appendix to his work - reluctantly. Later however he seemed to be happy playing with the sidings. Again a lesson to us all about taking time to try out changes that might not be out idea before dismissing them.

"Any change, even a change for the better, is always accompanied by drawbacks and discomforts." Arnold Bennett

Wednesday, 18 January 2012

Please could you elaborate


After yesterday's issues with non cooperation Isaac and his brother seem to have patched up their artistic differences. Isaac started by building a fairly compact layout with loops that interconnected through the turntable.

What was particularly intriguing was that he was experimenting with the Y points again. Instead of directly running them into the repair shed he used it to provide one route into the shed and the other branch to be  a continuation of one of his loops. To reach the other bay of the repair shed he created a separate line in.

The engine shed was used in a more conventional manner apart from the bridge that needed to be negotiated to get in.

This layout persisted for an hour or two until Isaac's brother wanted to play as well. With a bit of negotiating a new loop was added for Isaac's brother. As the turntable was deemed the best way of accessing this new loop Isaac placed the cross over piece in his side of the layout. This meant that Isaac had an interesting arrangement where a train starting from bay 2 of the repair yard would follow the route round that either led it to bay 1 or all the way back to bay 2.

Another thing I asked Isaac about was why his tunnel was blocked up later in the day. He explained that the steam trains had got it dirty so his men has washed it down and now they were waiting for it to dry before trains could pass through again.

Friday, 6 January 2012

Loops and bridges


I always said to myself that this blog would only be written when Isaac created. For a few days Isaac has been content to play with other toys and leave his track packed away. But my patience was rewarded by this fabulous creation.

Isaac started off with the turntable and the repair shed. He then built the loop that ran straight out from the repair shed looped back on itself through the tunnel and over the two bridges ending in the engine shed. Even Isaac commented this was a long way for a sleep. He then realised the other axis of the turntable had no track an built a straight line out of either side. The need to join these up resulted in the rather wonderful and compact lines at the centre of this layout.

This is the first time the lifting bridge has been used for a while. That is mainly because it has been in for repairs for the umpteenth time. It relies on two small pieces of hardboard to support the slopped tracks where the connect with the bridge. The hardboard seems to break off rather easily necessitating a dab of glue. The bridge had just come back, however close inspection will show a block being used to support one slope because yet again the hardboard broke. Some times Bigjigs quality is let down by little material weaknesses such as this or the crossing gates that sheer off with use.

I digress, back to the layout. Meanwhile Isaac's brother had been playing with a few pieces making sidings. There was a little collaboration and this became a completely separate loop. Finally it was decided to join the two tracks. Though the two tracks don't allow trains to move between them I think the intricacy of the way they weave in and put of each other quite brilliant. The remaining track was then used for a couple of sidings.

There is something very satisfying about this layout that I can't quite pin down.

Wednesday, 28 December 2011

Together everyone achieves more

The experimentation with the new pieces to the layout continues. Today Isaac and his brother cooperated very well and came up with a different way of using the track. They started by building a small layout that incorporated the engine shed, turntable, tunnel and repair shed. It was noticeable that the distance between these elements started to widen. Also there are no sidings. As I mentioned in the last post the engine shed is seen as a superior siding and the repair shed seems to occupy the same category. The turntable is still a track switching device though.

Once this was done Isaac's younger brother then busied himself with a second layout. It wasn't for himself, but for mummy. After trying for several minutes he called on mummy to help to complete the curves. It takes the form of a simple figure of eight which ingeniously uses the two small points as the crossover rather than the crossover piece or a bridge. I'm starting to wonder whether I will need to rename the blog at the rate Isaac's brother is catching up.

To complete the work there's third layout, consisting of just a small straight which is stand alone. This is daddy's track. And despite the fact that I have the shortest track I am afforded the longest train. I have seen small side layouts before, but this was the first time that there have been three. 


I am beginning to think we need more track and points in particular. Isaac's layouts, with the help of his brother, are starting to reach a level of complexity where there are not enough ways to join  up the loops and branches. 

Any ideas where I can lay my hands on cheap track, preferably free?

Tuesday, 27 December 2011

Christmas comes but once a year

I hope you all had a wonderful Christmas. As would be expected, Christmas 2011 gave Isaac and his brother have had some additions to their railway set. An engine shed, turntable and tunnel on Christmas day and a workshop and new train on boxing day. Today's post is the layout Isaac put together on Boxing Day morning, before he got the presents for that day.

It started, of course, with the new additions to the set. The engine shed was felt to be a superior siding, but later another one was added for the train with the black engine, Isaac and his brother call this train Old Puffer Pete. For those of you familiar with Chuggington you'll understand. The turntable and tunnel were added in quick succession and then the serious layout building began.

Isaac started off with the two interconnecting loops. It was quite a nice arrangement that allowed the trains to come out of the engine shed and enter the first loop straight ahead. This loop then swung round and the trains crossed the turntable from another direction. They then proceeded round the broader loop and crossed the turntable third time and ended up back at the engine shed. It was all very neat, but also said something about the way the turntable was viewed. Rather than a device to turn locomotives and roiling stock round it was used much more a method of switching the direction of the track.

Isaac quickly realised that this layout out some limitations. The main one being he and his brother were often in conflict about the direction of the turn table. He then proceeded to build a third loop which became a wonderfully complex arrangement with a siding, crossover and bridge. This extra track solved most of the conflict, or at least spaced them out.

I'm sure over the coming days even more interesting layouts will be devised. Especially as the possibilties of the new track and buildings are realised.